Real jobs from our records: what the client needed, what made it tricky, and how it turned out. We’ve withheld client names, but every figure comes from our Waste Transfer Notes, test records and project emails.

  • 1,000 panels off a supermarket roof, more than three-quarters reused
  • Five O&M sites cleared on the same day
  • 29.4 tonnes of solar equipment across the jobs on this page
  • 1,187 used panels functionally tested
Waste Carrier CBDU579018T11 EXP/HP3743JYWEEE RegisteredEngland, Wales & Scotland
Prefer to talk? 0330 223 7062
Have a similar job?
Tell us what you have. We'll come back with a written quote.
What needs collecting?

Commercial enquiries only. We reply within 24 hours.

At a glance

The jobs on this page

29.4 tonnes collected
PV panels and inverters across five jobs, each documented on a Waste Transfer Note.
More than 75% reused
On the supermarket roof upgrade, most panels went back into use instead of being recycled.
1,187 panels tested
Four batches tested for reuse. 1,055 passed.
Case study 01 · Supermarket roof upgrade

1,000 panels off a supermarket roof, mostly reused

The client: an energy services contractor upgrading the solar array on a supermarket store roof in Greater Manchester. About 1,000 older 250W panels were coming off to make way for the new system.

The challenge: the job came to us only days before the panels came off, after the contractor had first planned a different disposal route. Collections had to fit around the contractor’s working hours on site and change when their operatives weren’t there. Loading was by a 17-metre telehandler. Some panels were soiled after years at a low roof pitch.

What we did: the first collection ran two days after the job was confirmed: 15 pallets, panels stacked 27 to a pallet. We moved later loads around the contractor’s programme and cleared the site in three collections over eight days. All loads went on one Waste Transfer Note, which the project manager signed online.

The result: 12.15 tonnes cleared. More than three-quarters of the panels passed testing and went for reuse instead of recycling. When the contractor’s client later asked for evidence of where the panels went, for its sustainability reporting, the paperwork was ready to send.

  • 01
    Client type
    Energy services contractor
  • 02
    Site
    Supermarket store roof, Greater Manchester
  • 03
    Why
    Upgrade: old 250W panels replaced
  • 04
    Volume
    About 1,000 panels, 12.15 tonnes, 3 collections
  • 05
    Outcome
    More than 75% passed testing and were reused
  • 06
    What happened next
    The same contractor booked us for its next project: about 1,500 panels at a hospital in Norfolk
Client feedback

“Thanks for all of the effort you put into this, the service was flawless.”

Project Manager, energy services contractor (case study 01)

Case study 02 · O&M provider

Five solar sites cleared on the same day

The client: a national solar operations and maintenance (O&M) provider with damaged and faulty modules sitting at sites across southern and eastern England.

The challenge: small quantities spread across distant sites. Some sites had as little as 18 kg of waste, the largest 361 kg. Loads that small can be hard to get collected, and each site’s owner needs its own paperwork.

What we did: we booked a separate collection for each site, in Devon, Dorset, Somerset, Hampshire and Cambridgeshire, all on the same day. Every site got its own Waste Transfer Note.

The result: all five sites cleared in one day. The modules had cracks, faults or other damage, so all of them went to approved recycling. The O&M provider can give each asset owner paperwork for its own site.

  • 01
    Client type
    Solar O&M provider
  • 02
    Sites
    5, cleared on the same day
  • 03
    Waste
    Damaged and faulty PV modules
  • 04
    Volume
    About 0.5 tonnes in total, 18 kg to 361 kg per site
  • 05
    Outcome
    All recycled through approved facilities
  • 06
    Paperwork
    One Waste Transfer Note per site
More recent jobs

Other solar collections

→
9 tonnes · Nottinghamshire
Panels for an energy services company, collected in one job on a single Waste Transfer Note.
→
6 tonnes · Edinburgh area
Panels collected for a Scotland-based contractor. We collect across England, Wales and Scotland.
→
Panels + inverters · West Sussex
1.5 tonnes of panels and 0.2 tonnes of inverters from a farm business, recorded separately on one Waste Transfer Note.
Reuse testing

How many used panels passed testing?

These are four batches of used panels functionally tested with an I-V curve tracer, with the readings corrected for light conditions. Panels that pass can be certified for reuse rather than recycled. Readings marked invalid couldn’t be graded reliably, so those panels weren’t counted as passes or fails.

Panel typeTestedPassedFailedInvalid readingPass rate (valid readings)
60-cell polycrystalline (ET Solar)925816149598%
Older 160W modules (Sharp)1029309100%
Modern half-cut mono (LONGi)82771499%
Thin-film amorphous (Uni-Solar)78692797%

Failures were mostly low open-circuit voltage or suspected bypass diode faults. Source: Olital test records, 2026.

FAQs

Frequently asked questions

Yes. Every figure on this page comes from our Waste Transfer Notes, panel test records or project correspondence. We’ve withheld client names.
We don’t publish client names without permission. The client type, region, quantities and outcomes are all accurate.
Often, yes. In case study 01 the first collection ran two days after the job was confirmed. Tell us your deadline when you enquire and we’ll say honestly whether we can meet it.
Yes. Case study 02 shows five sites cleared on the same day, some with very little waste, with a separate Waste Transfer Note for every site.
They can be certified and resold for reuse instead of being recycled. Panels that fail go to approved recycling facilities.

Have a job like one of these?

Send us the quantity, panel type, location and deadline. We’ll come back with a written quote.

0330 223 7062
Monday to Friday, 8am–6pm
Get My Quote →