Solar Farm Decommissioning & Repowering
Solar Farm Decommissioning & Repowering Waste
Clearing a site or swapping old modules for new ones? We take the whole equipment stream off your hands: panels, inverters, racking and cabling. Everything comes back documented, so your planning, lease and ESG obligations are covered.
- From 50 panels to full farm clearances
- Working panels tested for reuse before anything is recycled
- Waste Transfer Notes and a recycling completion report as standard
- Zero-landfill approach
What does solar farm decommissioning involve?
Decommissioning a solar farm means taking the array apart and returning the land to its agreed condition. The modules, inverters, mounting structures and cabling are all removed. Most of what comes off is classed as WEEE, so it must go to a licensed carrier and an approved treatment route, with a Waste Transfer Note for every load.
Olital manages the waste side. We plan vehicles and loading, collect from site and test panels that could be reused. Everything else is recycled through Environment Agency-approved facilities, and you receive the paperwork your landowner, planning authority and investors will ask for.
The complete equipment stream
One contractor for everything that comes off the site, so nothing is left behind or sent to the wrong place.
From site survey to final certificate
Swapping modules? Your old panels may still have value
Repowering projects often take out panels that still work, just at a lower output than the new modules replacing them. Recycling those panels throws away years of useful generation.
We test panels with a handheld I-V curve tracer, correcting the readings for light conditions, and grade them pass or fail. For larger batches we certify a statistically sampled lot. Panels that pass can be resold for reuse rather than shredded, and any resale value is reflected in your quote.
- 01Every panel visually screenedDamaged modules are separated before any testing.
- 02Sampled batch testingBatches are sampled under ISO 2859-1 (AQL 2.5), so a whole lot can be certified.
- 03Publicly verifiable certificatesEach test certificate has a reference anyone can check online.
- 04Recycling for the restPanels that fail go into the recycling stream, fully documented.
Documents you receive
Decommissioning plans, planning conditions and lease obligations usually require evidence of how waste was handled. This is what you get from us.
| Document | What it proves | When |
|---|---|---|
| Waste Transfer Note | Each load was handed to a licensed waste carrier (CBDU579018) and correctly described. | Every collection |
| Duty of care certificate | You met your legal duty of care for the waste. | Every collection |
| Recycling completion report | Where the waste went and how it was processed. | After processing |
| Certificate of Recycling | A branded certificate whose reference can be checked publicly. | After processing |
| Panel test certificates | Which panels passed functional testing for reuse. | Where panels are tested |
Battery storage and other hazardous items are also covered by a Hazardous Waste Consignment Note.
Frequently asked questions
Planning a decommissioning or repowering project?
Send us the panel count, module type and target dates. We’ll come back with a written plan and quote.
0330 223 7062 Get My Quote →